Broadway, VA – approx. 45,400 sq. ft.

Completed in two phases, this project involved construction of new stadium concessions and restroom facilities (600 sf) followed by modifications to existing spaces (10,500 sf) and new construction of two additions (30,408 sf and 3,889 sf).

The larger two-story wing addition houses multiple classrooms and science labs as well as a broadcasting studio that utilizes pieces of local TV station WHSV’s former set. A new single-level building addition for the Athletic Department provides the BHS Fighting Gobblers with an additional team room and a weight room. Both new additions were finished to match the school’s existing brick exterior.

Renovations to reconfigure existing space included converting the existing weight room into two Ag Rooms and modifying two classrooms as part of the library expansion.