About This Project
Mount Jackson, VA – 28,000 sf
This project was constructed from clear span concrete tilt ups. The addition was used to manufacture and package fruit pouches. 25% of the addition was used for 2 full production lines and the other 75% was used for warehouse storage, the two areas were divided by masonry walls.