About This Project

Shenandoah, VA – 21,000 sf

This project featured a pre-engineered metal building used to house two 50 ton overhead cranes. The million dollar machines were part of a precision machine shop created to build construction cranes. The facility included a 38 foot ceiling at its eve to allow for the overhead crane.